Hawker Aero 2025 GPUs – The Most Advanced Models
Every year, we implement upgrades based on the feedback and needs of our customers.
For 2025, our GPUs have undergone a comprehensive redesign. We have managed to double the starting power without a significant increase in weight or size, marking an exceptional engineering achievement.
New 2025 Models:
-
Model 2680 – (26V) >80 Ah - Real-world test: 92 Ah
-
Model 2880 – (28V) >80 Ah - Real-world test: 92 Ah
-
Model 26180 – (26V) >180 Ah
-
Model 28180 – (28V) >180 Ah
In the new 26V models, the option to incorporate a rectifier or power supply unit connected in parallel to the host GPU for maintenance tasks will continue.
Starting October 2025, the Model 26180 will include a 30A rectifier/power supply. This GPU system is capable of starting and maintaining any model of helicopter, as well as turboprop aircraft. As an option, the parallel 50A and 60A rectifiers will remain available.
It's important to remember that all our models are modular. This allows two units to be connected in parallel, doubling their performance and capacity, while still being able to use each unit individually. This is a highly advantageous feature, as it provides greater capacity than a traditional, heavy hangar GPU, but with the versatility of using portable units separately whenever needed.
